Opening or reading an .mpp file without MS Project: the options
Published on · Pilotis
A client or subcontractor sends you their schedule as an .mpp file and you do not have MS Project. This is very common: the software is paid for and only installed on planners’ machines. Depending on what you need, reading the schedule, commenting on it or taking it over, the right solution is not the same.
1. Ask the sender for the right format
The simplest solution is often the best: ask for an export. A PDF of the Gantt chart (with the useful columns and the legend) is enough to read and comment. An Excel export gives a filterable table of tasks, dates and owners. To take the schedule into another program, ask for MS Project XML, which is more open than .mpp.
2. Third-party viewers and software
There are .mpp viewers and scheduling programs that can import them, including ProjectLibre, a free open-source program. They let you see tasks, dates and the Gantt chart. Their limit: the import is rarely perfect (calendars, custom fields, formatting), so keep them for reading.
3. Online services: mind confidentiality
Some websites offer to open or convert an .mpp online. Before uploading a schedule, ask yourself: does this file contain site dates, subcontractor names, costs? If so, it does not belong on an unknown server. At least check the terms of use and how long files are kept, or use another solution.
4. An MS Project subscription, even temporary
If you need to modify the schedule and send it back in the same format, you need MS Project. Microsoft offers monthly subscriptions, and sometimes trial periods depending on current offers: it is the only way to guarantee the file goes back to the sender intact.
5. Have the schedule taken over by a planner
When the schedule has to become yours (moved into Primavera P6, turned into a master schedule, presented to a steering committee), the safest option is to have it converted and checked. A clean Excel or PDF export, with only the useful columns, is also part of Pilotis scheduling support.
Example
Fictional example: a design office receives the client’s 900-task .mpp schedule. It only needs its own milestones to plan its deliverables. An Excel export filtered on its package, with start, finish and float, was enough: no licence or full conversion needed.
Checklist
- Know what you want to do: read, comment, modify or take over
- To read: ask for a PDF of the Gantt chart and an Excel export
- To take over: ask for MS Project XML
- Do not upload a sensitive schedule to an unknown website
- To modify and send back: use MS Project
- To move into Primavera P6: have it converted and checked
Scheduling support
Schedule causing trouble? A planner takes care of it.
MS Project file too heavy or corrupt, conversion to Primavera P6, clean-up, baseline: quote within 48 h, files kept confidential and deleted after the assignment.
Request a quoteThe tool to take action
Schedule and milestones
The Gantt chart that shows each task on a time scale, with the milestones not to miss.
See the tool