The Pilotis blog
Concrete guides with figures to steer your projects and your freelance business. Each article links to the tool that lets you act on your own numbers.
Scheduling tips: MS Project, Primavera P6 and methods
MS Project: 7 causes of a file that is too large, and how to slim it down
An .mpp file of tens of MB that is slow or crashes: the 7 most common causes and how to slim down an MS Project schedule without losing anything.
Read the article
Converting an MS Project schedule to Primavera P6: method and pitfalls
Moving an MS Project (.mpp) schedule to Primavera P6 (.xer): exchange format, calendars, constraints, baseline, and the checks to run before and after.
Read the article
Opening or reading an .mpp file without MS Project: the options
Received an MS Project (.mpp) file without the software? The options to read it, export it to PDF or Excel, and the confidentiality precautions to take.
Read the article
Project management and Lean
Construction site monitoring: schedule, progress and meetings that move things forward
How to monitor a construction site: schedule by package, progress measurement, S-curve, site meetings and punch list. Method and tools.
Read the article
Steering committee: prepare, run and actually decide
The steering committee step by step: purpose, attendees, agenda, KPI dashboard, decisions and minutes. With a model running order.
Read the article
Setting up a PMO in 90 days
Create a PMO step by step: role, scope, project portfolio, governance, tools and indicators. A three-month plan to get started.
Read the article
How to make a Gantt chart in Excel: a 6-step method
Build a Gantt chart in Excel: task breakdown, durations, dependencies, milestones, critical path and updates. Method and template.
Read the article
OEE calculation: formula, example and pitfalls
OEE (overall equipment effectiveness) explained: formula, availability, performance, quality, worked example and common mistakes.
Read the article
Late project: 7 warning signs of drift and how to take back control
Recognise a drifting project: frozen schedule, runaway budget, fuzzy scope, lingering actions. The warning signs and the plan to recover.
Read the article
Freelance
How to calculate your freelance day rate in 2026
The method to set a profitable day rate: target income, costs, tax and charges, and real billable days. Worked example and free calculator.
Read the article
Micro-enterprise or SASU: which should a French freelancer choose?
French micro-enterprise or SASU in 2026: ceilings, social charges, take-home income and social cover compared, with a €75,000 turnover example.
Read the article
EURL or SASU: which French company for your freelance business?
French EURL or SASU in 2026: manager charges, dividends, the 10% rule, social cover and unemployment benefit. A clear comparison to choose well.
Read the article
Salary or dividends in a SASU: how to find the right mix
How to split salary and dividends in a French SASU in 2026: charges, 15% corporation tax, 31.4% flat tax and pension. Example with €70,000 profit.
Read the article
The French PER pension for the self-employed: ceiling, tax saving and traps
The French PER pension for freelancers in 2026: deduction ceiling, tax saving, 5-year carry-forward and withdrawal rules. Worked example.
Read the article
Freelance cash flow: why you can be profitable and still overdrawn
Why a profitable freelancer can run out of money, and how to manage cash: payment terms, provisions for tax and VAT, and a safety reserve.
Read the article
ACRE 2026: what changes for new businesses in France
France’s ACRE scheme in 2026: social charge relief cut to 25% for businesses created from 1 July 2026, apply within 60 days, who is eligible.
Read the article
E-invoicing in France: what freelancers must do in 2026 and 2027
Mandatory e-invoicing in France: receiving from September 2026, issuing for small businesses from September 2027. What a freelancer needs to do.
Read the article