1. Home
  2. Consulting
  3. MS Project and Primavera P6 schedules: help from a professional planner

MS Project and Primavera P6 schedules: help from a professional planner

An .mpp file that takes two minutes to open, a Primavera schedule to move into MS Project, links and constraints everywhere, a steering committee that no longer reads the Gantt chart: these problems can be solved. Pilotis was founded by a practising planning engineer and PMO who works every week in MS Project and Primavera P6 in nuclear, industry, pharmaceuticals and energy.

What we check after every rework

  • Number of tasks and milestones
  • Links, lags and constraints
  • Calendars and durations
  • Resources and costs
  • Baseline
  • Finish date and critical path

Line-by-line check, with a variance report.

The problems we solve most often

Large or slow .mpp file

The file weighs tens of megabytes and freezes on recalculation or saving.

Corrupt file

Error message on opening, tasks that disappear, file that will not save.

Messy links and constraints

Fixed dates everywhere, tasks without successors, a critical path that means nothing.

Unreadable schedule

Thousands of lines without structure: nobody can find their way in a meeting.

MS Project to Primavera P6, or the reverse

Moving from .mpp to .xer (or XML) without losing links, calendars or the baseline.

Opening an .mpp without a licence

You receive an MS Project file and do not have the software.

Clean export to Excel or PDF

A readable Gantt chart for the client, a usable table for tracking.

Consolidation and master schedule

Packages, subcontractors, sites: one consistent master schedule from separate plans, or a backward schedule from a fixed date.

The scheduling support offer

On quotation, after a free 20-minute call. The price depends on the size of the file, the work required and the deadline.

  • File diagnosis and slimmingAnalysis of the .mpp or .xer, causes of slowness or corruption, a lighter repaired file, with a list of what was changed.
  • MS Project ↔ Primavera P6 conversionConversion done and checked by hand: tasks, links, calendars, resources and baseline checked, variance report provided.
  • Schedule clean-upA clear WBS, milestones, logic links instead of fixed dates, a reliable critical path and views ready for the steering committee.
  • Baseline and progress trackingSetting the baseline, progress method (physical %, remaining work), S-curve and update rhythm.
  • Flash trainingA specific question on MS Project or Primavera P6: 30-minute express session at €69 or 1 hour at €120 excl. VAT, on Teams.

No automatic online converter: every conversion is done and checked by hand by a planner, because a tool alone checks neither calendars, constraints nor the critical path.

How it works

  1. You describe the need — The form takes 2 minutes. For a large file, add a share link.
  2. We talk for 20 minutes — A free call to understand the context, deadlines and what you expect.
  3. You receive a quote — Fixed price and timing within 48 working hours. A non-disclosure agreement can be signed before anything is sent.
  4. We deliver and check — The fixed or converted file, the variance report and explanations for what comes next.

Your files stay confidential

Schedules often contain sensitive information. Your files are used only for the assignment, never passed to a third party and deleted when the assignment ends. A non-disclosure agreement (NDA) can be signed before anything is sent.

Request a quote

No attachments: for a large file, paste a share link. You can also wait for the non-disclosure agreement before sending anything.

Reply within 48 working hours.

Frequently asked questions

Do you offer an online MS Project to Primavera converter?
No. Conversion is a service done and checked by hand. The exchange format (XML or XER) is not enough: calendars, lags, constraints, resources and the baseline must be checked, then the finish date and critical path compared before and after.
How do I send you a large .mpp or .xer file?
Through a share link (OneDrive, Google Drive, WeTransfer) given in the form. If the schedule is sensitive, we sign a non-disclosure agreement first and you send the file afterwards.
Are my files kept?
No. They are used only for the assignment and deleted when it ends. They are never passed to a third party.
Which versions of MS Project and Primavera P6?
Recent versions of MS Project (desktop) and Primavera P6 Professional and EPPM. Give your version in the form: we return a file that opens on your side.
How much does it cost?
Each request gets a free quote, sent within 48 working hours after a free 20-minute call. For a specific question, the 30-minute express session costs €69 and the 1-hour session €120 excl. VAT.
Which scheduling tool: MS Project, Primavera P6 or Excel?
Excel is enough for a simple schedule of a few dozen tasks (our Schedule and milestones template). MS Project suits most projects and construction sites. Primavera P6 is the standard on large multi-package projects, often required by the client (nuclear, energy, infrastructure). We help you choose based on size, client and team.
I do not have MS Project: can you make the schedule readable?
Yes. We export the schedule to PDF (readable Gantt chart) and Excel (usable table), with the columns you need.

Microsoft Project and Primavera P6 are trademarks of their respective owners. Pilotis is affiliated with neither Microsoft nor Oracle.