Included in the Project Management Pack
WBS
The work breakdown structure: the project split into deliverables, then into work packages you can cost and assign.
€29 excl. VAT€34.80 incl. VAT, this tool only
Method guide, blank template and PDF + PowerPoint course included
Total:
See my selection (0)Company licence included
Unlimited use and editing within your company, including to train your teams. Your tools in your brand colours: on quotation
Card, PayPal, Apple Pay or Google Pay. No account. Invoice sent by email.
When to use it
Right after the charter, before building the schedule and the budget.
Where does it come from?
The Work Breakdown Structure was formalised by the US Department of Defense in the 1960s, alongside the PERT method. The PMBOK Guide makes it the basis of scope management.
Case study, fictional example
Building an 8,000 m² logistics facility
The project is split into 5 packages (design, structural works, finishing works, equipment, commissioning), then into 23 sub-packages. Each sub-package has an owner and a budget: nothing is forgotten, and the schedule is built directly from the packages.
The steps
- Start from the final deliverables
- Split into work packages
- Go down to packages you can cost
- Assign an owner to each package
What the template contains
- 3-level tree
- Code for each package
- Owner and budget per package
- Link to the schedule
Related terms
- WBS
- Work breakdown structure
- Project breakdown
- Scope
The case study is a fictional example, written to show how the tool is used.
Course preview
Extracts from the PDF handbook you receive. The PowerPoint deck covers the same content, ready to present to your teams.
Optional extra · €5 excl. VAT
The practice quiz: 30 questions
Check you have mastered the method before applying it: concepts, method and worked case studies, each question corrected and explained.
- Corrected practice and timed mock exam
- Score by theme
- Questions and answers shuffled on every attempt
- File to keep, works offline
Test yourself · 3 questions
Can you answer these?
Instant answer and explanation. Free, no sign-up.
What does the lowest level of a WBS contain?
- AWork packages, which can be costed, scheduled and assigned
- BThe stakeholders' names
- CThe risks
- DThe project goals
Frequently asked questions
- When will I receive the template?
- Right after payment: you land on a page where you can download your files.
- Can I edit the template?
- Yes. It is an open Excel file that you can adapt to your company and project.
- What does the course include?
- It comes free with the tool: a PDF handbook and a PowerPoint deck ready to present, to understand the tool and train your teams. The Excel file also has a Guide tab (step-by-step method, mistakes to avoid, checklist) and a blank copy ready to fill in.
- What software do I need?
- Microsoft Excel 2019 or later, or Microsoft 365.
The other tools in the Project Management Pack

Project charter
The document that sets the project's frame before it starts: why, what, for whom and with what resources.
€15 excl. VAT · course included

Schedule and milestones
The Gantt chart that shows each task on a time scale, with the milestones not to miss.
€29 excl. VAT · course included

S-curve
The curve of planned and actual cumulative progress, to see at once whether the project is ahead or behind.
€29 excl. VAT · course included

Budget
Tracking of planned, committed and actual costs, to see an overrun before paying it.
€29 excl. VAT · course included

Risks and actions
The register that lists what can go wrong, ranks it by criticality and assigns an action to each risk.
€29 excl. VAT · course included

Stakeholders
The map of the people involved in the project, ranked by influence and interest.
€29 excl. VAT · course included

RACI matrix
The table that states, for each task, who does it, who approves it, who is consulted and who is informed.
€15 excl. VAT · course included

Agile board
The visual board of tasks to do, in progress and done, to move forward in small steps.
€29 excl. VAT · course included

Dashboard
A one-page summary of progress, schedule, budget and risks, to decide fast.
€15 excl. VAT · course included

A3 project
The whole project on one page: background, causes, action plan, KPI tracking and decisions, with a calculated status.
€29 excl. VAT · course included

Meeting minutes
Information, decisions and actions from each meeting on one page, with overdue actions flagged automatically.
€29 excl. VAT · course included

PERT estimate
Three estimates per task, the expected project duration, critical path, floats and the probability of meeting your deadline.
€29 excl. VAT · course included

Business case
Investment, gains and costs over five years: ROI, NPV, IRR and payback, to decide whether the project is worth it.
€15 excl. VAT · course included

Scrum backlog and burndown
The prioritised backlog, sprint commitment and the ideal and actual burndown, to run an agile project.
€29 excl. VAT · course included

Closure and lessons learned
Success criteria met or not, then what worked, what to improve and actions for future projects.
€15 excl. VAT · course included