Late project: 7 warning signs of drift and how to take back control
Published on · Pilotis
A project does not fail overnight. The signs are there weeks before, but they are hard to see from the inside. Spotting them early lets you correct course with reasonable means.
The 7 warning signs
- The schedule is no longer updated, or only before steering committees
- A milestone slipped “exceptionally”, then a second one
- Budget spent is moving faster than work done
- Scope has grown without a formal decision
- The same actions stay open from meeting to meeting
- The team or a subcontractor is overloaded for weeks
- The sponsor no longer decides on blocking issues
Take an honest look
Go through the schedule task by task with the people doing the work, measure actual progress and remaining work. Compare cost and progress with earned value: a cost performance index below 1 means each euro spent produces less than planned.
Decide rather than endure
Present the sponsor with two or three costed scenarios: reduce scope, add resources, move the date. Each has a cost; what matters is choosing explicitly, then rebuilding a credible baseline.
Get back to a steering rhythm
- A short weekly check on critical tasks
- Risk register reviewed every week
- Dashboard shared with management
- Actions with owner and due date, followed through to closure
Take the test
The free “Is your project drifting?” check goes through ten warning signs and shows the risk level and the actions to take first. Two minutes are enough to know where you stand.