Aerospace and defence project management

Design reviews, a stretched supply chain, configuration requirements: Pilotis structures your programmes to hold milestones and secure quality.

  • Aerospace programme
  • Milestones
  • WBS
  • PERT
Schedule and controlGantt · milestones · critical path S1S2S3S4S5S6S7S8ScopingPlanningDeliveryTestsAcceptanceClosure Critical path ■ · Progress 46 % Risk matrix Budget 78 % CPI 1,04

Industry challenges

What we see in the field

01

Programme milestones

Prepare reviews and track deliverables at each milestone.

02

Supply chain

Anticipate supplier delays and their effect on the schedule.

03

Technical risks

Identify, rate and treat risks and failure modes.

04

Non-conformities

Handle quickly and trace every gap, from supplier to assembly.

The Pilotis method

Four steps, visible results

  1. Break down — the programme into packages and deliverables (WBS)
  2. Estimate — durations with PERT and the critical path
  3. Anticipate — risks and failures with the register and FMEA
  4. Steer — gaps with A3 and monthly reviews
  • Aerospace programme
  • Milestones
  • WBS
  • PERT
  • FMEA
  • Supply chain
Field follow-upGemba walk · visual management WorkshopArea BStockDock Field checklistWorkstation safetyStandard displayed5S area BGap handledAction plan up to date Open actions 7 → 2

Let’s talk about your project

20 free minutes to take stock

A first free discovery call, by phone or Teams. Then one-off help from 30 minutes, or support on quotation for companies.

Frequently asked questions

Do you work under confidentiality constraints?
Yes: a non-disclosure agreement can be signed before any documents are shared.
Can the tools fit our milestone reviews?
Yes. Pilotis templates are customised on quotation with your milestones, deliverables and gate criteria.