All-trades schedule
A delay on one package spreads to the next: you need to see the critical path and decide early.
Industry · Construction
Packages that follow one another, a punch list that drags on, co-activity to make safe: Pilotis structures your site monitoring so that every meeting moves the works forward.
Industry challenges
A delay on one package spreads to the next: you need to see the critical path and decide early.
Measure physical progress, compare it with the plan and anticipate handover.
List, assign and close snags before handover, without endless chasing.
Prevention plan, toolbox talks, hot work permits: safety is steered like everything else.
The Pilotis method
Recommended tools
The Gantt chart that shows each task on a time scale, with the milestones not to miss.
€29 excl. VAT
The curve of planned and actual cumulative progress, to see at once whether the project is ahead or behind.
€29 excl. VAT
Information, decisions and actions from each meeting on one page, with overdue actions flagged automatically.
€29 excl. VAT
The register that lists what can go wrong, ranks it by criticality and assigns an action to each risk.
€29 excl. VAT
The prevention plan with a contractor: interference risks, measures, responsibilities and whether a written plan is required under French rules.
€29 excl. VAT
The hot work permit for welding, cutting and grinding: measures before, during and after the work, and a calculated decision to start.
€15 excl. VAT
Magnetic dry-erase project control board, 120 × 90 cm, Pilotis branded: 12-month schedule, milestones, status, risks and actions.
Pilotis safety leader kit: 90 × 60 safety cross board, set of 24 A2 posters and the Health and Safety Pack (12 tools, 24 toolbox talks).
Let’s talk about your project
A first free discovery call, by phone or Teams. Then one-off help from 30 minutes, or support on quotation for companies.