Outages and tight windows
Prepare and hold very tight schedules, where every hour counts.
Industry · Energy and nuclear
Planned outages, major works, safety and documentation requirements: Pilotis brings rigorous control of schedule, cost and risk, at the pace of your governance.
Industry challenges
Prepare and hold very tight schedules, where every hour counts.
Track earned value to see overruns before they get expensive.
Prevention plans, hot work permits and coordination of many contractors.
Boards that decide quickly, on reliable shared indicators.
The Pilotis method
Recommended tools
The work breakdown structure: the project split into deliverables, then into work packages you can cost and assign.
€29 excl. VAT
The curve of planned and actual cumulative progress, to see at once whether the project is ahead or behind.
€29 excl. VAT
The register that lists what can go wrong, ranks it by criticality and assigns an action to each risk.
€29 excl. VAT
The prevention plan with a contractor: interference risks, measures, responsibilities and whether a written plan is required under French rules.
€29 excl. VAT
The hot work permit for welding, cutting and grinding: measures before, during and after the work, and a calculated decision to start.
€15 excl. VAT
The status of all your projects on one page: planned and actual progress, budget and forecast, high risks and decisions needed.
€29 excl. VAT
Magnetic dry-erase project control board, 120 × 90 cm, Pilotis branded: 12-month schedule, milestones, status, risks and actions.
Pilotis PMO office kit: 120 × 90 portfolio and control boards, 2 magnet kits, PMO Kit (4 Excel tools) and a 2-hour video kick-off.
Let’s talk about your project
A first free discovery call, by phone or Teams. Then one-off help from 30 minutes, or support on quotation for companies.