Energy and nuclear project management

Planned outages, major works, safety and documentation requirements: Pilotis brings rigorous control of schedule, cost and risk, at the pace of your governance.

  • Energy project
  • Nuclear project
  • Outage planning
  • Earned value
Steering committeeMonthly review · executive KPI dashboard KPI+18 % Decision: go Action: D+7 Schedule94 %Budget98 %Risks3

Industry challenges

What we see in the field

01

Outages and tight windows

Prepare and hold very tight schedules, where every hour counts.

02

Cost control

Track earned value to see overruns before they get expensive.

03

Subcontracting and co-activity

Prevention plans, hot work permits and coordination of many contractors.

04

Governance

Boards that decide quickly, on reliable shared indicators.

The Pilotis method

Four steps, visible results

  1. Structure — the work breakdown and responsibilities
  2. Control — risks, costs and schedule with earned value
  3. Make safe — prevention and co-activity of external contractors
  4. Govern — with a dashboard and regular boards
  • Energy project
  • Nuclear project
  • Outage planning
  • Earned value
  • Risk management
  • Steering committee
Field follow-upGemba walk · visual management WorkshopArea BStockDock Field checklistWorkstation safetyStandard displayed5S area BGap handledAction plan up to date Open actions 7 → 2

Let’s talk about your project

20 free minutes to take stock

A first free discovery call, by phone or Teams. Then one-off help from 30 minutes, or support on quotation for companies.

Frequently asked questions

Do you know the requirements of the nuclear sector?
Pilotis draws on project experience in energy and nuclear. The requirements specific to your site are built into the scoping with your safety and quality teams.
Can you strengthen an existing project team?
Yes, as an outsourced PMO or with one-off support on schedule, cost or risk, on quotation.